We always think and practice corresponding to the change of circumstance, and grow up. We goal at the achievement of a richer mind and body and also the living for Wholesale Price China Hot Sale Africa Durable Steel Frame Light Keel Roll House Forming Machine, Sincere cooperation with you, altogether will make happy tomorrow!
We always think and practice corresponding to the change of circumstance, and grow up. We goal at the achievement of a richer mind and body and also the living for C Channel Steel Roll Forming Machine, Cold Roll Forming Machine, Metal Stud Roll Forming Machine, Our items are widely recognized and trusted by users and can meet continuously changing economic and social needs. We welcome new and old customers from all walks of life to contact us for future business relationships and mutual success!
Equipment components of C channel light steel keel making machine:
Manual decoiling, roll forming machine, computer control system, hydraulic control system, cutting, run out table.
Light steel keel roll forming machine parameters |
||
1 | Main motor power | 4kw/3 phase (or as your request) |
2 | Hydraulic motor power | 3kw |
3 | Hydraulic pressure | 10~12MPa |
4 | Voltage | 380V/3 phase/50HZ (or as your request) |
5 | Control System | PLC Delta /Panasonic/Siemens/ |
6 | Main Frame | 300/350mm H-Beam |
7 | Backboard Thickness | 17/20mm |
8 | Chain size | 1/2inch |
9 | Feeding material | color steel coils |
10 | Feeding thickness | 0.18~0.8mm |
11 | Feeding width | Better as your profile or from our design |
12 | Effective width | Better as your profile or from our design |
13 | Productivity | 0-3min |
14 | Roll station | 11~20 roll steps(according to different design) |
15 | Roller diameter | 75mm (according to different design) |
16 | Roller material | 45#steel |
17 | Cutter material | Cr12 |
18 | Cr-Plating size | 0.05mm |
19 | Overall size | 5000mm*1000mm*1500mm |
20 | Total weight | 2~12T |
C channel light steel keel roll forming machine picture display
Packaging Details:
1. Machine is covered by plastic film
2. PLC control box, spare parts and other small parts are packed by wooden carton box.
Terms:
1. Delivery: within 60 days after receiving the deposit.
2. Package: export standard package for container.
3. Payment: TT (30% by TT in advance, 70% by TT after inspect the machine before delivery).