Steel profile door frame roll forming machine parameters |
||
1 | Material width | 3 sizes. Waiting for buyer exactly profile |
2 | How to adjust size | Option : by PLC (It can be adjust by PLC and also in hand wheel) One side fixed and the other is adjustable by manual or PLC |
3 | Base frame | base frame 30 mm thick steel plate process the surface on CNC planer to keep it leveling and drill bolts and key slot by CNC |
4 | Rolling Speed | 12-15m/min(not include cutting time) |
5 | Rolling Thickness | 1.2-2.0mm |
6 | Material | GI or metal |
7 | Control System | PLC (Panasonic) as list in the note |
8 | decoiler | 3 Ton manual decoiler |
9 | Leveling | Up in 3 roller, down in 4 roller |
10 | Roller Stations | About 20 stations |
11 | Roller Material | Gcr15, coated with chrome HRC58-62 degree |
12 | Shaft Material and DIA | ¢70mm, material is 45# forge steel |
13 | Maim Motor Power | 11kw brake motor |
14 | Hydraulic Station Power | 5.5kw |
15 | Hydraulic Pressure | 20Mpa |
16 | Capacity of tonnage for punching | 22Tons |
17 | Hydraulic pump brand | Lichao |
18 | Cutting | Hydraulic post-cutting for cut end product |
19 | Extra cutter | One more cutter for each profile |
20 | Material Of Cutting | Cr12Mov quenching 58-62ºC |
21 | Electric Source | 380V, 60HZ,3 phase |
22 | Way Of Drive | 1.2 inch single chain |
23 | Color Of The Machine | Yellow and blue |
24 | Machine Type | Iron Cast |
25 | Emergency switch | In main machine and control panel all have emergency switch for forbid any urgently accident. |
26 | Protect cover | Complete mobile safety cover from roll forming to the cutter. |
27 | Size of the machine | L*W*H 12m*1.2m*1.2m |
28 | Container Need | 1 x40 feet (base on final) |
The steel door frame roll forming machine is a complete product line. After roll forming by our production line, we could make very smooth and beautiful steel door frame without any scratch on surface.
Machine picture display
Packaging Details:
1. Machine is covered by plastic film.
2. PLC control box, spare parts and other small parts are packed by wooden carton box.
Terms:
1. Delivery: within 60 days after receiving the deposit.
2. Package: export standard package for container.
3. Payment: TT (30% by TT in advance, 70% by TT after inspect the machine before delivery).