Roof Ridge Tiles Building Materials Machinery

Short Description:


  • FOB Price: Get Latest Price from inquiry
  • Min.Order Quantity: 1 set
  • Supply Ability: 200 sets per Month
  • Port: TIANJIN
  • Payment Terms: L/C,D/A,D/P,T/T,Western Union,Money Gram payments for offline orders.
  • Lead Time: 25-35 days after received the deposit
  • Product Detail

    Machine production process

    Packaging & Delivery

    FAQS

    Product Tags

    Roof Ridge Tiles Building Materials Machinery

    Machine parameters

    1 Decoiler Manual decoiler or hydraulic decoiler
    2 Raw material thickness 0.2-0.8mm
    3 Material As your requirements
    4 Machine dimensions 7000*800*1500mm
    5 Feeding width According to your profile
    6 Forming station 13 to 15 steps
    7 Shaft diameter 75mm
    8 Shaft material High-grade 45# steel, heated and quenched
    9 Roller material High-grade 45# steel, coated with 0.05mm chrome
    10 Forming speed 10-15m/minute (adjustable)
    11 Transmission type Chain transmission
    12 Machine frame stand Welded structural steel, thickness is 18mm
    13 Main motor 5.5kW from Shanghai, China
    14 Cutting type Stop hydraulic cutting
    15 Cutting power 3kW
    16 Cutter material Cr12 with quenched treatment HRC 58-62
    17 Cutting length error ±2mm
    18 Voltage 380V/50Hz and 3 or according to your requirements
    19 Control system PLC control system
    20 Size of PLC 700*1000*300mm
    21 PLC Delta
    Ridge cap machine
    Ridge cap machine cutter
    Ridge cap machine roller
    Ridge cap machine chain

    Why choose us?

    Our company has a professional team of engineers and export team.
    Engineer: 25;                            Factory workers: 88;
    Finance staff: 2;                        Purchasing staff: 12;
    Operator: 3;                              Sales staff: 8;
    After-sales staff: 5.

    Our machine is warranted for 24 months.
    During the warranty period, if the damaged part cannot be repaired, we can send the new part for replacement of the damaged part for free, but you will need to pay the courier fee yourself. If after the warranty period, we can negotiate to resolve the issue and provide technical support throughout the life of the device.

    We offer technical support for the entire life of our machines.

    We can send our technicians to install and train the workers in the clients' factories.


  • Previous:
  • Next:

  • Drawing confirmation

    ——After confirming the final profile with the customer, the team of 12 engineers worked out detail workable parts CAD drawings;

    ——After 5 recheck, the production manager arrangement the material for all machine parts;

    Start production

    ——Our company owns 12sets rough lathe machine, 20sets precise lathe machine, and 30sets shearing machine, all machine parts start to manufacture.

    Product Inspection 

    ——Our company Own 3sets hard test machine, and 4sets surface thickness Chromium test machine.

    ——Roller and shaft: Our Inspect team test 90% wheels and shafts, confirm all parts size precise and performance after processing.

    ——Our Inspect team test all roller surface, confirm all part surface paint above 5um.

    ——Mainframe and medium plate: Our Inspect team test the mainframe and plate cutting precise.

    Assembling machine

    ——5 worker assemble and welding one machine body frame by three days.

    Machine painting

    ——Putty ensure weld parts surface smoothly, and environment-friendly paint ensure protect worker body and environment.

    Machine Manual use test

    ——Confirm the output sheet tolerance within 2mm.

    Cutter production

    ——According to the finally manufacture sheet, confirm the blade precise profile, Cr12MOV steel cutting knife finished by laser cutting.

    Storage

    ——To protect the machine surface clear and without damage, we paint again and package by the film.

    Machine production process

    Packaging

    Our products are usually available in two packaging methods: plastic film packaging and plastic film + wooden box packaging.

    1. The main machine is covered with plastic film.

    2. PLC control box, spare parts, and other small parts are packed by wooden cartons.

    Delivery

    Two days before delivery, we unpacked and repainted the machine and repackaged it.

    packing & transport

    1) Q: Do you have after-sales support?

    A: Yes, we are happy to give advice and we also have skilled technicians available across the world. We need your machines running in order to keep your business running.

    2) Q: How do your machines compare with other big companies in this market?

    A: We are up to date with the latest technology and improve our machines accordingly.

    3) Q: How does your factory do regarding quality control?

    A: Quality is the priority. we always attach great importance to quality control from the very beginning to the end of the production. Every product will be fully assembled and carefully tested before it’s packed for shipment.

    4) Q: Do you sell only standard machines?

    A: No, most of our machines are built according to customers’ specifications, using top brand name components.

    5) Q: Can you make the machine according to my design or prototype?

    A: Yes. We have an experienced team for working out the most suitable design and production plan for the machine that you are going to book with us.

    WhatsApp Online Chat !