We strive for excellence, service the customers”, hopes to become the best cooperation team and dominator enterprise for personnel, suppliers and customers, realizes value share and continuous promotion for Professional China Stainless And Aluminum Auto Channel Letter Bending Machine For Sale, The principle of our company is to provide high-quality products, professional service, and honest communication. Welcome all friends to place trial order for creating a long-term business relationship.
We strive for excellence, service the customers”, hopes to become the best cooperation team and dominator enterprise for personnel, suppliers and customers, realizes value share and continuous promotion for Auto Channel Bender, Channel Letter Bending Machine, Chnnel Letter Bender, We are eager to cooperate with foreign companies which care much on the real quality, stable supply, strong capability and good service. We can provide the most competitive price with high quality,because we’ve been much MORE Specialist. You are welcomed to visit our company at any time.
4 meters hydraulic roof sheet bending machine parameters |
||
1 |
Cutting &Hydraulic type |
Double guide pillar |
2 |
Hydraulic motor power |
3kw |
3 |
Hydraulic Pressure |
10-12MPa |
4 |
Voltage |
380V/3phase/50 HZ(or as your requirement) |
5 |
Cutting drive |
Decelerating motor+ Chain drive gear all by high-frequency |
6 |
Control System |
Panasonic PLC |
8 |
Bending degree |
0-90 |
9 |
Operating mode |
Button+ Mitsubishi |
10 |
Main Frame |
300mm/350mm H-Beam or 350mm |
11 |
Backboard Thickness |
17mm |
12 |
Feeding Material |
GI/PPGI/PPGL |
14 |
Feeding Thickness |
0.2-0.8mm |
15 |
Feeding Width |
1-4m |
16 |
Effective width |
1-4mm |
17 |
Productivity |
0-60times/min |
20 |
Roller material |
45# steel |
21 |
Cutter material |
Cr12 mould steel heat-treated hardness of HRC = 60-62 degrees |
22 |
Brand Square |
A3 35mm thick plate arch |
22 |
Cr-Plating Size |
0.05mm |
23 |
Overall Size |
4300*1200*2100mm |
24 |
Total Weight |
1.8T |
Machine photos
Packaging Details:
1. Machine is covered by plastic film.
2. PLC control box, spare parts and other small parts are packed by wooden carton box.
Terms:
1. Delivery: within 60 days after receiving the deposit.
2. Package: export standard package for container.
3. Payment: TT (30% by TT in advance, 70% by TT after inspect the machine before delivery).