Sticking towards the principle of “Super High-quality, Satisfactory service” ,We’ve been striving to become a superb business partner of you for Original Factory High quality high speed iso ce die cutting galvanized light steel keel c bracing c keel c shape roll forming machine, We are able to customize the merchandise according in your prerequisites and we will pack it in your case when you purchase.
Sticking towards the principle of “Super High-quality, Satisfactory service” ,We’ve been striving to become a superb business partner of you for , Strict quality control is executed in each link of the whole production process.We sincerely hope to establish the friendly and mutual-beneficial cooperation with you. Based on high quality solutions and perfect pre-sales /after-sales service is our idea, some clients had cooperated with us for more than 5 years.
Equipment components of C channel light steel keel making machine:
Manual decoiling, roll forming machine, computer control system, hydraulic control system, cutting, run out table.
Light steel keel roll forming machine parameters |
||
1 | Main motor power | 4kw/3 phase (or as your request) |
2 | Hydraulic motor power | 3kw |
3 | Hydraulic pressure | 10~12MPa |
4 | Voltage | 380V/3 phase/50HZ (or as your request) |
5 | Control System | PLC Delta /Panasonic/Siemens/ |
6 | Main Frame | 300/350mm H-Beam |
7 | Backboard Thickness | 17/20mm |
8 | Chain size | 1/2inch |
9 | Feeding material | color steel coils |
10 | Feeding thickness | 0.18~0.8mm |
11 | Feeding width | Better as your profile or from our design |
12 | Effective width | Better as your profile or from our design |
13 | Productivity | 0-3min |
14 | Roll station | 11~20 roll steps(according to different design) |
15 | Roller diameter | 75mm (according to different design) |
16 | Roller material | 45#steel |
17 | Cutter material | Cr12 |
18 | Cr-Plating size | 0.05mm |
19 | Overall size | 5000mm*1000mm*1500mm |
20 | Total weight | 2~12T |
C channel light steel keel roll forming machine picture display
Packaging Details:
1. Machine is covered by plastic film
2. PLC control box, spare parts and other small parts are packed by wooden carton box.
Terms:
1. Delivery: within 60 days after receiving the deposit.
2. Package: export standard package for container.
3. Payment: TT (30% by TT in advance, 70% by TT after inspect the machine before delivery).