Light Gauge Steel Stud Track Framing Machine Quick Details
Material | Colored steel sheet, galvanized steel sheet, aluminum sheet |
Thickness of coil sheet | 1.0-2.0mm |
Efficiency width | 25/30mm |
Roller material | High grade NO. 45 forged steel with 0.05mm hard chrome plating |
Shaft material | High grade NO. 45 carbon wrought steel |
Cutting blade | Cr12 mould steel with quenched treatment |
Diameter of shaft | 70mm or as your requirement |
Main frame | 300 H steel |
Forming steps | 16 stations |
Productivity | 30-35m/min |
Hydraulic station power | 5.5 KW |
Hydraulic pressure | 10-12MPa |
Appearance size | 7700mm*1500mm*1500mm |
Hydraulic oil | 40# hydraulic oil |
Electric tension | 380V 50 Hz 3 Phase or as your requirement |
Cut Mode | Hydraulic forming after cutting off |
Cutter materia | Cr12 Heat Treatment |
Electronic control system | PLC, Touch Screen, Encoding counter |
Color | Blue, green or yellow or as your requirement |
Rolling material | 45# steel,roller surfaces polishing, hard plating |
Light Gauge Steel Stud Track Framing Machine Details
Installation and training services:
A. If buyers visit our factory and check the machine, we will teach you how to install and use the machine, and also train your workers/technician face to face.
B. Without visiting, we will send you user manual and video to teach you to install and operate.
C. If buyer needs our technician to go to your local factory, please arrange board and lodging and other necessary things.
Light Steel Keel Forming Machine Advantage
1. Good quality: We have a professional designer and experienced engineer team. And the raw material and accessories we use are good.
2.Good service: we provide technical support for the whole life of our machines.
FAQ
Q: Are you a trading company or a factory?
A: We are factory with the professional production team and service consciousness just for exporting various types of cold roll forming machines.
Q: How long does it take to produce the machine?
A: Generally speaking, the machine can be completed within 20~45 working days. But if you need machines urgently, we can do our best to save you time.