We know that we only thrive if we can guarantee our combined price competiveness and quality advantageous at the same time for Good Quality Machinery Light Steel Frame Keel Molding Roll Forming Equipment Machine, We have now a big inventory to fulfill our customer’s calls for and needs.
We know that we only thrive if we can guarantee our combined price competiveness and quality advantageous at the same time for Cold Roll Forming Machine, Light Keel Frame Roll Forming Machine, Steel Profile Roll Forming Machine, now we have all day online sales to make sure the pre-sale and after-sale service in time. With all these supports, we can serve every customer with quality product and timely shipping with highly responsibility. Being a young growing company, we might not the best, but we are trying our best to be your good partner.
Equipment components of C channel light steel keel making machine:
Manual decoiling, roll forming machine, computer control system, hydraulic control system, cutting, run out table.
Light steel keel roll forming machine parameters |
||
1 | Main motor power | 4kw/3 phase (or as your request) |
2 | Hydraulic motor power | 3kw |
3 | Hydraulic pressure | 10~12MPa |
4 | Voltage | 380V/3 phase/50HZ (or as your request) |
5 | Control System | PLC Delta /Panasonic/Siemens/ |
6 | Main Frame | 300/350mm H-Beam |
7 | Backboard Thickness | 17/20mm |
8 | Chain size | 1/2inch |
9 | Feeding material | color steel coils |
10 | Feeding thickness | 0.18~0.8mm |
11 | Feeding width | Better as your profile or from our design |
12 | Effective width | Better as your profile or from our design |
13 | Productivity | 0-3min |
14 | Roll station | 11~20 roll steps(according to different design) |
15 | Roller diameter | 75mm (according to different design) |
16 | Roller material | 45#steel |
17 | Cutter material | Cr12 |
18 | Cr-Plating size | 0.05mm |
19 | Overall size | 5000mm*1000mm*1500mm |
20 | Total weight | 2~12T |
C channel light steel keel roll forming machine picture display
Packaging Details:
1. Machine is covered by plastic film
2. PLC control box, spare parts and other small parts are packed by wooden carton box.
Terms:
1. Delivery: within 60 days after receiving the deposit.
2. Package: export standard package for container.
3. Payment: TT (30% by TT in advance, 70% by TT after inspect the machine before delivery).