We purpose to understand high quality disfigurement with the output and supply the top service to domestic and overseas buyers wholeheartedly for Factory Cheap Hot Galvanized Light Gauge Drywall Used Stud Omega Steel Keel Profile Roll Forming Machine, We focus on to make excellent quality items to provide provider for our shoppers to determine long-term win-win romance.
We purpose to understand high quality disfigurement with the output and supply the top service to domestic and overseas buyers wholeheartedly for Drywall Used Omega Profile Machine, Galvanized Drywall Omega Profile Machine, Stud Keel Light Gauge Steel Roll Forming Machine, We pay high attention to customer service, and cherish every customer. We’ve got maintained a strong reputation in the industry for many years. We have been honest and work on building a long-term relationship with our customers.
Equipment components of C channel light steel keel making machine:
Manual decoiling, roll forming machine, computer control system, hydraulic control system, cutting, run out table.
Light steel keel roll forming machine parameters |
||
1 | Main motor power | 4kw/3 phase (or as your request) |
2 | Hydraulic motor power | 3kw |
3 | Hydraulic pressure | 10~12MPa |
4 | Voltage | 380V/3 phase/50HZ (or as your request) |
5 | Control System | PLC Delta /Panasonic/Siemens/ |
6 | Main Frame | 300/350mm H-Beam |
7 | Backboard Thickness | 17/20mm |
8 | Chain size | 1/2inch |
9 | Feeding material | color steel coils |
10 | Feeding thickness | 0.18~0.8mm |
11 | Feeding width | Better as your profile or from our design |
12 | Effective width | Better as your profile or from our design |
13 | Productivity | 0-3min |
14 | Roll station | 11~20 roll steps(according to different design) |
15 | Roller diameter | 75mm (according to different design) |
16 | Roller material | 45#steel |
17 | Cutter material | Cr12 |
18 | Cr-Plating size | 0.05mm |
19 | Overall size | 5000mm*1000mm*1500mm |
20 | Total weight | 2~12T |
C channel light steel keel roll forming machine picture display
Packaging Details:
1. Machine is covered by plastic film
2. PLC control box, spare parts and other small parts are packed by wooden carton box.
Terms:
1. Delivery: within 60 days after receiving the deposit.
2. Package: export standard package for container.
3. Payment: TT (30% by TT in advance, 70% by TT after inspect the machine before delivery).