With our loaded encounter and considerate services, we have now been recognized as a trustworthy supplier for lots of worldwide consumers for China Supplier Light Steel Angle Bar Roll Forming Machine Light Keel Wall Angle Making Machine, Welcome your visiting and any your inquires,sincerely hope we can have chance to cooperate with you and we can build up long well business relationship with you.
With our loaded encounter and considerate services, we have now been recognized as a trustworthy supplier for lots of worldwide consumers for Cold Roll Forming Machine, Metal Roll Forming Machine, Stud Roll Forming Machine, With the principle of win-win, we hope to help you make more profits in the market. An opportunity is not to be caught, but to be created. Any trading companies or distributors from any countries are welcomed.
Equipment components of C channel light steel keel making machine:
Manual decoiling, roll forming machine, computer control system, hydraulic control system, cutting, run out table.
Light steel keel roll forming machine parameters |
||
1 | Main motor power | 4kw/3 phase (or as your request) |
2 | Hydraulic motor power | 3kw |
3 | Hydraulic pressure | 10~12MPa |
4 | Voltage | 380V/3 phase/50HZ (or as your request) |
5 | Control System | PLC Delta /Panasonic/Siemens/ |
6 | Main Frame | 300/350mm H-Beam |
7 | Backboard Thickness | 17/20mm |
8 | Chain size | 1/2inch |
9 | Feeding material | color steel coils |
10 | Feeding thickness | 0.18~0.8mm |
11 | Feeding width | Better as your profile or from our design |
12 | Effective width | Better as your profile or from our design |
13 | Productivity | 0-3min |
14 | Roll station | 11~20 roll steps(according to different design) |
15 | Roller diameter | 75mm (according to different design) |
16 | Roller material | 45#steel |
17 | Cutter material | Cr12 |
18 | Cr-Plating size | 0.05mm |
19 | Overall size | 5000mm*1000mm*1500mm |
20 | Total weight | 2~12T |
C channel light steel keel roll forming machine picture display
Packaging Details:
1. Machine is covered by plastic film
2. PLC control box, spare parts and other small parts are packed by wooden carton box.
Terms:
1. Delivery: within 60 days after receiving the deposit.
2. Package: export standard package for container.
3. Payment: TT (30% by TT in advance, 70% by TT after inspect the machine before delivery).