C profile stud machine

Short Description:


  • FOB Price: Get Latest Price from inquiry
  • Min.Order Quantity: 1 set
  • Supply Ability: 200 sets per Month
  • Port: TIANJIN
  • Payment Terms: L/C,D/A,D/P,T/T,Western Union,Money Gram payments for offline orders.
  • Lead Time: 25-35 days after received the deposit
  • Product Detail

    Product Tags

    Our C profile stud machine can be designed according to the buyer’s samples or drawings. The work Flow for the galvanized metal studs and tracks roll forming machine is as follows: Decoiler → Feeding Guide → Roll Forming → Cut-to-length → Run out table.

    C profile stud machine parameters

    1 Suitable to process Color steel plate
    2 Width of the plate As customer need
    3 Thickness of the plate 0.5-1.2mm
    4 De-coiler Manual one, can load 3 tons raw material
    5 Rollers for forming 18 rows
    6 Diameter of the roller Φ52mm
    7 Rolling material Carbon steel 45#
    8 Main motor power 4kW
    9 Productivity 8-12m/minute
    10 Cutting method Hydraulic mold cutting
    11 Material of the cutting blade Cr12
    12 Hydraulic cutting power 3kW
    13 Processing precision Within 1.00mm
    14 Control system Delta PLC control
    15 Side panel of machine 25mm
    16 Main structure of the machine 300H steel
    17 Weight About 6.5T
    18 Dimensions 5.5*1.0*1.5m
    19 Voltage 380V/50Hz/3 phases (changeable as needs)

    Components:

    Manual decoiler ——————————————1 set

    Guiding platform —————————————–1 set

    Main machine of roll forming ————————–1 set

    Electric motor ———————————————1 set

    Cutting device ———————————————1 set

    Hydraulic station ——————————————1 set

    PLC control ————————————————1 set

    Supporter table ———————————————1 set

    C profile stud machine details

    double keel machine details

    t grid machine details

    C profile stud machine Packaging Details

    1. Machine is covered by plastic film.

    2. PLC control box, spare parts and other small parts are packed by wooden carton box.

    Terms:

    1. Delivery: within 60 days after receiving the deposit.

    2. Package: export standard package for container.

    3. Payment: TT (30% by TT in advance, 70% by TT after inspect the machine before delivery).


  • Previous:
  • Next:

  • WhatsApp Online Chat !